Twin Industries
International |
|
If any are of interest please e-mail us the reference numbers, together with your full company name, address, contact and telephone and fax numbers. We will then arrange for a full specification and quote to be sent to you by the supplier.
If the Turbine or Generator you require is not listed we will try and find it for you.
Used Tornado, Typhoon and Nomad Gas Turbines available
6MW Kaluga Backpressure Steam Turbine
Manufactured 1961
Year of shutdown 1998
Last overhauled 2009
Total hours of operation 163,000 hours
Speed 3000 rpm
Inlet steam temperature 435 deg C
Inlet steam pressure 35 bar
Exhaust steam temperature 306 deg C
Exhaust steam pressure 11 bar
Steam flow 65 tons/hr
c/w Electrosila Generator
Capacity 6000KW
Voltage 6300 V
Frequency 50 hz
Power factor 0.8
Speed 3000 rpm
2 x 25MW UTMZ Condensing Steam Turbines
Manufactured 1964/65
Total hours of operation 97,000/87,000 hours
Speed 3000 rpm
Inlet steam temperature 535 deg C
Inlet steam pressure 90 bar
Exhaust regulating steam lead
Steam flow 161 tons/hr
c/w Electrosila Generator
Capacity 25000KW
Voltage 6300 V
Frequency 50 hz
Power factor 0.8
Speed 3000 rpm
50MW LMZ Backpressure Steam Turbine
Manufactured 1977
Total hours of operation 40,000 - 50,000 hours
Speed 3000 rpm
Inlet steam temperature 540 deg C
Inlet steam pressure 130 bar
Exhaust steam pressure 13 +/- 3 bar
Steam flow 490 tons/hr
c/w Electrosila Generator
Capacity 6000KW
Voltage 10.5 kV
Frequency 50 hz
Power factor 0.8
Speed 3000 rpm