Twin Industries
International |
|
If any are of interest please e-mail us the reference numbers, together with your full company name, address, contact and telephone and fax numbers. We will then arrange for a full specification and quote to be sent to you by the supplier.
If the Turbine or Generator you require is not listed we will try and find it for you.
YANMAR 16 NHL - 1900 KVA PRIME POWER GENSET
Manufactured 1990
Hours run: approx 2800 hours
Engine
1 x Yanmar 16NHL-ETP - 16 cylinder in Vee formation
Twin turbocharged and aftercooled developing 2130 Bhp 1573 Kw @ 1500 Rpm
Close coupled to:
Alternator
1 x Leroy Somer Type LSA 51 L9-4P, rated at 1900 Kva @ 380v/440v 3 phase 50 Hz, 1500 Rpm
Configuration
The engine and alternator are mounted onto a heavy duty steel base frame.
Fitted with heavy duty oil and air filtration systems. 24v starting, 55 deg C free standing, electric fan cooled radiator
Controls
No panel or breaker is included.
Cooling
Remote electric fan cooled radiator.
History
The set was supplied to a large company in Europe for winter peak loping
and was replaced by a larger Yanmar set.
Used Tornado, Typhoon and Nomad Gas Turbines available
5MW Dual Fuel Mirrelees Generating Sets (2 off)
Engine type 7047-1
Brush exciter 600rpm
Manufactured 1992
1 @ 65543 hours, 1@ 60271 hours
6.3MW Combined Heat & Power Plant
Comprising:
1 x Alsthom Tornado Gas Turbine 50 Hz, 11 kv
1 x Alsthom Waste Heat Recovery Boiler 14 tons/hr. 22 bar
Year of manufacture 1995
2.5MW W H ALLEN &Sons Steam Turbine
inlet steam pressure 425 psi
steam temp 750 degrees farenheit
passout 35,000 pounds of steam per hour at 35 psi
Turbine speed 6500 rpm
water cooled alternator
condensing set.
3MW W H ALLEN &Sons Steam Turbine
inlet steam pressure 425 psi
steam temp 750 degrees farenheit
passout 35,000 pounds of steam per hour at 35 psi
Turbine speed 4500rpm
air cooled Bruce Peebles alternator
condensing set.
10MW Combined Heat & Power Plant
Comprising:
2 x 5.05MW Alstom DLE Typhoon Gas Turbine power generation packages 50 Hz, 15 kv
1 x Alsthom Waste Heat Recovery Boiler 24 tons/hr. 22 bar
Year of manufacture 1995
3,5MW Ruston TB5000 Gas Turbine
Manufactured 1981
Dual fuel (natural gas/light fuel oil)
complete with:
Gas compressor designed to raise incoming gas pressure from 3 to 11 bar
33m Chimney
Waste heat economiser installed in 1993
Gas fired supplementary burner installed in 1993